Soil Nail Wall For Earth Retention – Chula Vista, Ca

Groundforce-Commercial-Soil-Engineering Services San DiegoGroundforce-Commercial-Soil-Engineering Services San Diego

 

 

Chula Vista, CA – Construction of a 17,000 square foot Soil Nail wall to provide earth retention for the construction of new Clear Well water storage tanks. The wall measured approximately 54 feet at its tallest point. Over 500 cubic yards of Shotcrete was installed in addition to 530 soil nails ranging in length from 25 to 52 feet deep. Excavation for the wall required in excess of 35,000 cubic yards of grading.
 
 

Flood Control Channel Construction – Orange County, CA

Structural Concrete Culverts Water Systems

Flood control channel construction. A structural concrete municipal project. Work included concrete lining (4,220 cubic yards of Shotcrete), Box Culverts and transition structures (545 Cubic yards of Cast in Place concrete) Reinforcing steel (285,000 lbs.) Rip rap channel protection (2,700 tons), earthwork (28,700 cubic yards), de-watering and storm drainage upgrades.

Structural-Concrete-Drainage-Water-Systems