Soil Nail Wall For Earth Retention – Chula Vista, Ca

Groundforce-Commercial-Soil-Engineering Services San DiegoGroundforce-Commercial-Soil-Engineering Services San Diego

 

 

Chula Vista, CA – Construction of a 17,000 square foot Soil Nail wall to provide earth retention for the construction of new Clear Well water storage tanks. The wall measured approximately 54 feet at its tallest point. Over 500 cubic yards of Shotcrete was installed in addition to 530 soil nails ranging in length from 25 to 52 feet deep. Excavation for the wall required in excess of 35,000 cubic yards of grading.
 
 

Shotcrete Wall


Recent Large Concrete Wall Project

Nothing better than finishing a job on a Thursday! Seven loads of float finish shotcrete by early afternoon. A little clean up and the guys get to head to a new job tomorrow!

Project QC/Inspection: Christian Wheeler Engineering (Click this link to read more on  Mike Wheeler)


CONTACT US


GROUNDFORCE

1220 Presioca St.
Spring Valley, CA 91977

 

Phone: 888-290-6574

Fax: 858-560-8960

Email: info@groundforcecrew.com