A civil project in Chula Vista, CA applied box channel construction as a remedy for flood control. The work included extensive shoring using temporary soil nail walls (4,900 square feet) and storm water by-pass systems (2,950 lineal feet). Box channel cast-in-place concrete with (3155 cubic yards and 345,000 lbs. of rebar) was installed including 31,600 cubic yards of grading and the addition of 3 pedestrian bridges across the completed channel.