Flood control channel construction. A structural concrete municipal project. Work included concrete lining (4,220 cubic yards of Shotcrete), Box Culverts and transition structures (545 Cubic yards of Cast in Place concrete) Reinforcing steel (285,000 lbs.) Rip rap channel protection (2,700 tons), earthwork (28,700 cubic yards), de-watering and storm drainage upgrades.