Groundforce just completed Tie Back installation for the Zip Line ride at the San Diego Safari Park

Groundforce just completed Tie Back installation for the Zip Line ride at the San Diego Safari Park. If you look closely at the photo you can see a Rhino doing whatever it is that Rhinos do.

A set of 60 foot long tie backs were installed through a grade beam system to provide additional load capacity for the ride.

Project Structural Engineering was provided by Taquino Engineering. Geotechnical Engineering and Materials testing was provided by Southern California Soil and Testing20150921_082059